Skip to main content

TT/TN/IT Systems

Technical comparison of TN-S, TN-C, TN-C-S, TT, and IT earthing arrangements and fault clearing.

5 rows

Earthing SystemNeutral & PE TopologyFault Disconnection Rule
TN-SNeutral (N) and protective earth (PE) separate throughoutZs · Ia ≤ U0 (breaker or RCD)
TN-C-S (PME)Combined PEN in supply, split into N + PE at main service panelZs · Ia ≤ U0 + multiple earthing of PEN
TN-CCombined PEN conductor throughout (restricted industrial use)Not permitted below 10 mm² (8 AWG) Cu or 16 mm² (6 AWG) Al
TTSource neutral earthed; exposed frames tied to local earth electrodeRa · IΔn ≤ 50 V (RCD / GFCI protection)
ITSource unearthed or earthed through high impedanceInsulation monitoring device (IMD); continuity on first fault

Save this calculation and export it as a PDF with the Vexten app.Google PlayApp Store

Questions

What technical specifications does the TT/TN/IT systems table include?

Technical comparison of TN-S, TN-C, TN-C-S, TT, and IT earthing arrangements and fault clearing. It compiles 5 reference entries organized across Earthing System, Neutral & PE Topology and Fault Disconnection Rule for fast lookup during design and field maintenance.

How do you look up and select the right rating in TT/TN/IT systems?

Locate the target earthing system in the first column (spanning from TN-S through IT) or type any designation, size, or rating into the search bar above to filter matching rows instantly.

What practical factors should you check when applying TT/TN/IT systems data?

Confirm that the protective device clears both sustained overloads and bolted faults within the conductor thermal withstand time while maintaining bonding continuity and upstream selectivity.

Related buying guides